We dug material out of this shop, and then we brought some of it right back in. That looks a little backwards until you see what was underneath.
The slab was 65 feet by 30 feet and eight inches thick. We needed the finished floor high enough above the outside grade to slope water away from the building. But if we’d just dug down to the elevation we needed, we’d have been pouring on clay. That’s not where I wanted the slab sitting.

There was a good layer of sandy gravel above that clay. It was material we could compact and reuse. So we saved it, took out another three or four inches of clay, and brought the good stuff back in. Same gravel, just sitting lower. That gave us room for the concrete without leaving it on the clay we’d exposed.
Getting the grade right
We ended up with about six inches of compacted sandy gravel, then six-mil plastic, then half-inch rebar on an 18-inch grid.

We also wanted two inches of fall from the back of the shop to the front. The subgrade needed that same slope. Otherwise we’d be changing the slab thickness as we went. We checked it with the laser and an eight-inch gauge board under the string lines.
It took a few tries to dial in, but by the end the grade was consistent across the floor. I was happy with that. The guys had worked through how to set the grade, check it and correct it. That’s how it starts to stick.
There were existing metal walls and steel columns to work around too. We braced the siding from the outside so the fresh concrete wouldn’t push it out. At the big equipment doors, we dug deeper trenches for thickened edges. That’s where machines come in and out, so we wanted a substantial edge there.

Working out the pour before the trucks arrived
We prefilled those deeper edges with bagged concrete ahead of the main pour and let them set over the weekend. The truck needed to back in close so we could run its chute through the doorway and load the buggies. I didn’t want the edge of an open trench caving in while we did that.
Inside, we set removable screed guides to grade. We’d place a section, work to the guide, pull it and blend that strip into the rest. The guides gave us a reference we could check, instead of trying to find every bit of floor elevation in wet concrete.
Pour day
Then we had to make the actual day cooperate.
We placed five truckloads, about 50 cubic yards of ready-mix. The bagged concrete at the door edges was separate. A buggy delay put us behind. The rain turned to snow. Later the throttle cable broke on the power trowel, and we had to make a temporary repair to get it running again.
The last load was also setting faster than some of the earlier concrete, and the immediate problem was keeping up with it. We moved between areas instead of finishing everything in the neat order we’d have liked.
One thing worked exactly as intended: the slope. Most of the water coming in the open doorway ran away across the floor instead of sitting there.
By the end, I was happy with the main slab. There was still cleanup to do, and exterior landing details to go over with the customer. I could pick out little spots I’d have liked to do better. But standing back and looking across the whole floor, it had come together well.

That’s concrete. You spend a lot of time getting the base, the reinforcement, the elevations and the access ready, and you should. Then you still have to watch what’s happening in front of you once the trucks start showing up.